Work In Progress #351

paint-two-crop
Date 12 August 2016
admin

Greetings from #rdcHQ! The historic 351-Building gets a beautiful new look thanks to Shawn, Painter Extraordinaire, and the rest of the 351-Paint Crew. A collaboration with our neighbors at Cut’N Dry Salon, we’re simply ecstatic with the results.

Without further ado, we present a timelapse video that we created the weekend that the facade was painted. The wind and fog rolled in before we could capture the final footage of the building with the finished trim, so we’ll upload a revised version of the video at a later date when we can capture the building in ideal conditions at the same perspective. Until then … Enjoy!


The All New rdcHQ … A Work In Progress …

… and the 351-Building at dusk … it’s a work of art!

351-paint

Share this article

Leave a comment